
The upper level was for train traffic and lower level was originally for electric street rail eventually this level was used for car traffic.
Here's a close up:

The bridge need to be removed due to extensive deterioration. 
Wenzel Engineering laid out a plan to get it done.
www.wenzelengineering.com
No comments:
Post a Comment